Skip to content
TierMenu

Plumbing

Plumbing bidding software for small jobs and replacements

Plumbing bidding software for small jobs prices a residential bid with options and collects a signature. TierMenu is for service and replacement bids, not plan takeoff, and the page below explains where that line sits.

Who it is for

Plumbing shops bidding repiping, fixture packages or water heater replacements for homeowners.

Not a fit if

You bid multi-unit or commercial jobs from drawings. Use a takeoff tool to count fixtures and pipe from the plans.

Sample Heating & Air

Proposal P-1001 · Sample customer

Sample

Good

Repair and restore cooling

3 items

Total

Your price
Choose this option
Recommended

Better

Repair plus preventive parts

4 items

Total

Your price
Selected

Best

Full repair and yearly care

5 items

Total

Your price
Choose this option

Fictional sample data from the TierMenu app.

Small plumbing jobs versus plan-based bids

A bid for a bathroom remodel or a repipe is built from a walk-through and a conversation, then priced from tasks you already know. That is where TierMenu helps: it keeps the price consistent, shows options, and records approval. A bid for a new building is built from plan sheets, fixture counts and riser diagrams, and the quantity work is the hard part. Software that reads plans is the right tool there. Being honest about this saves you time: if the job starts with drawings, start with a takeoff tool, and come back to TierMenu for the residential work.

Separate service bids from construction takeoffs

A service contractor usually prices work after visiting the property and confirming the problem. A commercial bid may require plan takeoff, fixture counts from drawings, subcontractor pricing, bid forms, alternates and project-level controls. TierMenu supports the service workflow, not that commercial estimating process. Use it when a small shop needs a consistent way to quote a repair, replacement or other defined job to a homeowner. If your team prices work from a large set of construction documents, choose software designed for commercial takeoff and bidding rather than expecting a service proposal tool to measure plans.

Document what the technician has verified

A defensible service quote begins with the site conditions the technician has actually seen. Note the customer's request, the inspection findings, relevant access assumptions and anything that still needs investigation. Use a diagnostic or assessment step when the cause is uncertain. Keep the bid specific to the work being offered, and say when a separate approval is needed for additional repairs. Plumbing conditions can change after a fixture or line is opened, so do not make an unverified condition sound resolved before the work begins.

Create options the homeowner can compare

Use separate proposal options only when there is a real difference in repair approach, replacement scope or included service. Explain what each choice covers and where it ends. Add-ons should stay optional and should not be used to hide required work. TierMenu supports one to four options, a recommended option and optional add-ons. The technician can present the choices on a device or send a link for remote review. The company decides what work is appropriate and sets the prices; the app organizes the proposal and stores the customer's selection.

Keep prices tied to company assumptions

TierMenu calculates formula tasks from the company's billable labor rate, time assumptions, material costs and markup rules. Owners can review cost and margin; technicians see the customer price without access to private cost details. The starter library provides names and descriptions, not recommended plumbing bid amounts. Confirm the labor and material assumptions against the defined work before sending. A bulk price preview can help when settings change, but manually priced tasks still need a separate review.

Preserve approval and state limitations

After the homeowner signs, TierMenu locks the approved proposal and stores the signed PDF. If new work becomes necessary, create a revised proposal or change order and request approval for the updated scope. TierMenu does not process payments, dispatch crews, sync accounting or perform commercial plan takeoff. It is a focused tool for small plumbing service and replacement bids. Review proposal terms against local requirements, and keep licensing, permits, code decisions and customer disclosures with the contractor.

Screen the bid request before preparing it

Ask what document the customer expects and how the scope will be measured. A repair request based on an on-site inspection may fit a service quote. A bid invitation that asks for drawing-based quantities, alternates across multiple trades, schedule commitments or subcontractor pricing needs a construction estimating workflow. Do not omit those requirements and then present a service proposal as if it were a full bid response. If the project is within TierMenu's scope, verify that every task comes from inspected work, make exclusions visible and retain the approval record. This screening prevents a mismatch between the tool and the customer's expectations.

Keep the approved scope distinct from later findings

After a plumbing service bid is accepted, the technician may uncover a condition that was not visible during the original inspection. Pause, explain the new finding and prepare a separate description of the added work. Obtain approval through the company's normal process before changing the scope or amount. Keep the original proposal available so the homeowner can compare what was first offered with the updated work. TierMenu preserves the signed proposal and supports a revised document, but your company remains responsible for communicating changes, checking permits and following local contract requirements.

How it works in TierMenu

  1. Step 1

    Walk the job

    Record what you verified and what the bid excludes.

  2. Step 2

    Price the options

    Build options from your tasks and optional add-ons.

  3. Step 3

    Record the decision

    The customer approves and signs. The scope is locked.

TierMenu, a spreadsheet and a paper price book

TopicTierMenuSpreadsheetPaper price book
Comparing optionsSide by side with a recommended choiceSeparate tabsOne number on a page
Counting fixtures from plansNot includedManualManual
ApprovalOn-screen signature and locked scopeSigned scanSigned paper

FAQ

Can I use it for plumbing service bids?

Yes. TierMenu supports service and replacement quotes and small jobs. Build the proposal from work confirmed at the property and explain assumptions or exclusions clearly.

Does it take off plumbing quantities from blueprints?

No. It does not measure commercial plans or generate fixture and pipe quantities from construction drawings. Use a commercial takeoff tool for that workflow.

Can the customer choose between repair options?

Yes. Present distinct options when the inspection supports them, explain how the scope differs and keep optional add-ons clearly separated.

Does TierMenu provide plumbing bid prices?

No. Your company sets the labor, material, markup and final sell price. The starter task library contains names and descriptions only.

Can an approved bid be changed later?

An approved proposal is locked. Create a revised proposal or change order for additional work, then obtain approval and preserve the original signed document.

Updated

Put one price on every job.

14-day free trial. No credit card. Up to 5 users on one plan.