Who it is for
Electrical shops that want service tasks priced from their own labor rate and current wire, breaker and device costs.
Not a fit if
You need load calculations or code compliance decisions. TierMenu prices work; it does not engineer it.
Price book
7 need pricing- HVACNeeds pricing
Replace run capacitor
Electrical components
- HVACNeeds pricing
Replace contactor
Electrical components
- HVACNeeds pricing
Replace condenser fan motor
Motors
- PlumbingNeeds pricing
Replace toilet fill valve
Toilets
- PlumbingNeeds pricing
Replace 40-gallon gas water heater
Water heaters
- ElectricalNeeds pricing
Install GFCI receptacle
Devices
- ElectricalNeeds pricing
Install whole-home surge protector
Panels
Replace run capacitor
Live breakdown- Laborlabor hours x your billable rate
- Your number
- Materialsqty x unit cost x your markup tier
- Your number
- Fixed feeoptional, set by you
- Your number
- Roundingnone, $1, $5 or end in 9
- Your number
Owners also see true cost and gross margin. Technicians never do.
Fictional sample data from the TierMenu app.
Copper and device price swings
Wire, breakers and devices change cost often, and a price book that does not follow those changes slowly gives away margin. In TierMenu each task lists the materials it uses, with quantities and unit costs, so when a cost changes the task prices that depend on it recalculate. For a broad move, use the bulk percent change with a preview, and apply it to the materials you select. Because a task carries its materials, a swap of a breaker or a run of cable is priced from the same sources every time, and every technician quotes the same number.
Set rates and markup that reflect your operation
Configure the billable labor rate, burdened labor cost, material tiers, optional fixed fees and rounding rule your business has chosen. A task can then use labor time and material assumptions to calculate its customer price. Owners can review the formula and gross margin. Technicians see only the approved price and customer description. TierMenu does not select a rate, account for every local tax rule or guarantee profitability. Verify that each input matches your actual labor, purchasing and service model, and review the assumptions with the person responsible for your shop's pricing.
Separate customer scope from internal costs
A price-book entry needs both an internal calculation and clear customer wording. Keep material costs and markup private while describing the work in terms the homeowner can understand. Define what is included and where the scope ends. If an inspection, permit or additional repair may change the job, make that uncertainty explicit. The customer should not need to see labor burden or markup to understand what is being offered. Review permissions so only the intended owner or office roles can update pricing settings, and ensure technicians have enough access to prepare accurate proposals.
Preview broad changes before the team uses them
A change to labor rate or markup may affect many formula-based tasks at once. Preview proposed changes, check representative tasks and confirm that the resulting price still corresponds to the intended work. Review manual prices separately because they do not change with the formula. If only a particular category has changed, focus on those entries rather than adjusting unrelated service tasks. Keep a record of the internal decision and effective date in your own process. TierMenu provides the before-and-after preview; the shop owner remains responsible for approving the new prices.
Bring consistent prices into a proposal
After approving the price book, technicians can use its tasks to present work options to homeowners. Group related tasks into a clear scope, separate optional items and identify the selected option. TierMenu supports remote approval, on-device signatures and signed PDFs. The customer sees the chosen work and total, while internal costs remain private. A saved approved selection can support a simple invoice later. The app does not determine whether a particular installation is safe or code-compliant; the licensed contractor must make those decisions at the property.
Keep the tool within its intended scope
TierMenu is for small service businesses that want pricing, proposals, maintenance agreements and simple invoices. It does not perform electrical engineering calculations, commercial blueprint takeoff, dispatch, payroll, inventory tracking or payment processing. Use appropriate technical calculators and professional review where required, and retain your existing systems for the workflows TierMenu does not cover. Before using a new price book, review a sample task with the team and confirm that its name, work description and price assumptions are clear to both technicians and customers.
Review one service category at a time
A practical electrical pricing review can start with one category, such as device work or a defined service repair. Confirm that task descriptions do not combine work with different inspection requirements, and check that parts match what technicians actually carry or purchase. Compare labor assumptions with the work as your company performs it; do not treat a broad task label as proof that every site condition is covered. Review a technician's access separately from the owner's cost view. Once the category is accurate, use the same review method on other task groups instead of making a single unexamined rate adjustment across the whole catalog.
How it works in TierMenu
- Step 1
Build tasks with materials
Add the wire, devices and breakers each task uses.
- Step 2
Update costs
Change a material cost or preview a percent change.
- Step 3
Quote consistently
Technicians pick the task and show the same approved price.
TierMenu, a spreadsheet and a paper price book
| Topic | TierMenu | Spreadsheet | Paper price book |
|---|---|---|---|
| Copper price moves | Update the material, formula tasks follow | Edit cells, audit formulas | Reprice by hand |
| Tasks and their materials | Stored together on the task | Spread across tabs | Remembered by the senior electrician |
| Same price for each technician | One approved sell price per task | Different copies in circulation | Different binders in different trucks |
FAQ
Does TierMenu set an electrical contractor's labor rate?
No. The business owner enters labor and material assumptions, markup tiers and rounding. Formula tasks use those settings, which the owner can review before presenting a price.
Can technicians view cost and margin?
No. Authorized owners can see cost and gross margin. Technicians see customer-facing prices and descriptions without the private cost inputs.
Will all tasks update when I change pricing rules?
Formula-based tasks recalculate, while manually priced tasks remain unchanged. Preview bulk changes and review manual entries separately before adopting the new pricing.
Does the app confirm code compliance?
No. A qualified contractor must inspect the site, determine applicable requirements and decide what work is appropriate. TierMenu is a pricing and proposal tool.
Can I use it for commercial electrical bids?
Not for commercial plan takeoff. TierMenu is built for service and replacement quotes and small jobs, not measuring quantities from blueprints.
Updated